First Entry
Hardware Identified
Hardware Requirements from Facilities Groups
CERN Tier-0 (Equipment status as of Feb 5)
- cmsdc04 Login aavailable (Contact Werner for password)
- Login and daemons systems available before end of week on lxgate04.cern.ch
- 5 Dedicated P4 Xeon nodes with 2.4GHz 1GB memory 100BaseT
- 2 1.3TB Disk Servers one for General Distribution Buffer (GDN) and one for SRB Export Buffer (EB)
- RLS ready
- Transfer Management database on ORACLE OK
FNAL Tier-1 (Equipment status as of Feb 2)
- 622Mpbs to CERN with 250Mbps sustained
- 2 4TB RAID devices for Import Buffers (IB). Configured with dCache migrates to Enstore
- 1 Dual CPU P4 Xeon for SRM server
- 1 dual CPU P3 system for Tier1 Agent
- 10 dual CPU Xeon systems available analysis
- 1 dual CPU Xeon system for analysis job submission
- Tape allocated 50TB
PIC Tier-1 (Equipment status as of February 3)
- 400Mbps Network to CERN, but 80Mb sustained
- 2-4 TB of Input Buffer
- 80 2.8GHz Xeon CPUs with Gigabit networking and 1GB RAM
- 10TB of disk (20TB possible)
GridKa Tier-1 (Equipment status as of February 3 )
- 1Gbit to CERN network shared
- 50 CPUs available for challenge
- 5TB input buffer
UK Tier-1 (Equipment status as of January 23)
- 1Gb Link to CERN shared
- 8TB of Input Buffer
- 50TB Tape Space
- 60 CPU Farm for analysis
IN2P3 Tier-1 (Equipment status as of February 5)
- 2TB input buffer (in a 4TB shared system)
- 70TB Tape available
CNAF Tier-1 (Equipment status as of February 6)
- 1GB Link to CERN (500Mbps seen sustained)
- 8TB of disk now (Potentially 20TB additional for DC04)
- 70 dual Xeon systems for analysis