| WBS | Start_Date | Finish_Date | Task Name | |||||
| 1 | ###### | ###### | USCMSSC User Facility (UF) | |||||
| 1.1 | ###### | ###### | USCMS Facilities Project | |||||
| 1.1.1 | ###### | ###### | Building Components | |||||
| 1.1.1.1 | ###### | ###### | Hardware Benchmarking, Evaluation and Technology Tracking | |||||
| 1.1.1.2 | ###### | ###### | Data Storage and Data Access | |||||
| 1.1.1.3 | ###### | ###### | Configuration/Installation Management | |||||
| 1.1.1.4 | ###### | ###### | Resource Management | |||||
| 1.1.1.5 | ###### | ###### | Networking | |||||
| 1.1.1.6 | ###### | ###### | Collaborative Services | |||||
| 1.1.1.7 | ###### | ###### | Grid R and D | |||||
| 1.1.1.8 | ###### | ###### | R and D Assessment, Review, Promotion, Termination and proposal of new R and D projects | |||||
| 1.1.2 | ###### | ###### | Facilities Testbed Activities | |||||
| 1.1.2.1 | ###### | ###### | Hardware Selection, Deployment | |||||
| 1.1.2.2 | ###### | ###### | Testbed Facilities Projects | |||||
| 1.1.2.3 | ###### | ###### | Prototype for interactive and batch analysis | |||||
| 1.1.2.4 | ###### | ###### | Distributed Production Testbed Prototypes | |||||
| 1.1.2.5 | ###### | ###### | Distributed Analysis Testbed Prototypes | |||||
| 1.1.2.6 | ###### | ###### | Grid Fabric Testing | |||||
| 1.1.2.7 | ###### | ###### | Facilities Testbed Operations | |||||
| 1.1.2.8 | ###### | ###### | Testbed Assessment, Review, Promotion, and Termination | |||||
| 1.1.3 | ###### | ###### | Production Facilities | |||||
| 1.1.3.1 | ###### | ###### | Facility Preparations | |||||
| 1.1.3.2 | ###### | ###### | Operations | |||||
| 1.1.3.3 | ###### | ###### | USCMS Production Grid UPG | |||||
| 1.1.3.4 | ###### | ###### | Simulated Event Production | |||||
| 1.1.4 | ###### | ###### | Facilities executive | |||||
| 1.1.4.1 | ###### | ###### | Liaison, Computing Model development, Management | |||||
| 1.1.5 | ###### | ###### | Equipment Costs and Investments | |||||
| 1.1.5.1 | ###### | ###### | Computing Elements | |||||
| 1.1.5.2 | ###### | ###### | Storage Elements | |||||
| 1.1.5.3 | ###### | ###### | Network Elements | |||||
| 1.1.5.4 | ###### | ###### | Software | |||||
| 1.2 | ###### | ###### | Physics Analysis Facility (PAF) | |||||
| 1.2.1 | ###### | ###### | Facility planning and procurement | |||||
| 1.2.1.1 | ###### | ###### | System specification, design, installation. | |||||
| 1.2.1.2 | ###### | ###### | Host server systems | |||||
| 1.2.1.3 | ###### | ###### | Small Backup systems | |||||
| 1.2.1.4 | ###### | ###### | Component tests, technology tracking | |||||
| 1.2.2 | ###### | ###### | Desktop support (on-site, off-site) | |||||
| 1.2.2.1 | ###### | ###### | Maintenance of CMS Linux desktop workgroup. | |||||
| 1.2.2.2 | ###### | ###### | Code distribution system (on-site and off-site). | |||||
| 1.2.3 | ###### | ###### | Documentation | |||||
| 1.2.3.1 | ###### | ###### | Providing Documentation - OP | |||||
| 1.2.4 | ###### | ###### | Collaborative Tools | |||||
| 1.2.4.1 | ###### | ###### | Support for Collaborative Tools | |||||
| 1.2.4.2 | ###### | ###### | Support for Collaborative Tools - OP | |||||
| 1.2.5 | ###### | ###### | Development Environment | |||||
| 1.2.5.1 | ###### | ###### | Software librarian. | |||||
| 1.2.5.2 | ###### | ###### | Development and installation of the infrastructure, | |||||
| 1.2.5.3 | ###### | ###### | Software developer support | |||||
| 1.2.5.4 | ###### | ###### | License maintenance | |||||
| 1.2.6 | ###### | ###### | Administration, Monitoring + Problem Resolution Software | |||||
| 1.2.6.1 | ###### | ###### | User administration tools | |||||
| 1.2.6.2 | ###### | ###### | Resource allocation and tracking tools | |||||
| 1.2.6.3 | ###### | ###### | Resource/process monitoring tools | |||||
| 1.2.6.4 | ###### | ###### | Computer security e.g. setup of intrusion detection tools (e.g. tripwire) | |||||
| 1.2.7 | ###### | ###### | Secretarial staff. | |||||
| 1.2.7.1 | ###### | ###### | Secretarial Administrative Support - OP | |||||
| 1.2.8 | ###### | ###### | User Help Desk | |||||
| 1.2.8.1 | ###### | ###### | Problem tracking tool | |||||
| 1.2.9 | ###### | ###### | Training Office | |||||
| 1.2.9.1 | ###### | ###### | User Training | |||||
| 1.2.9.2 | ###### | ###### | Training Support Staff - OP | |||||
| 1.2.9.3 | ###### | ###### | Library - OP | |||||
| 1.2.0 | ###### | ###### | Virtual Control Room | |||||
| 1.2.0.1 | ###### | ###### | VCR Hardware OP | |||||
| 1.2.0.2 | ###### | ###### | Procurement and Installation - OP | |||||
| 1.2.0.3 | ###### | ###### | VCR Maintenance - OP | |||||
| 1.2.0.4 | ###### | ###### | VCR Software - OP | |||||
| 1.2.0.5 | ###### | ###### | Deployment and Development - OP | |||||
| 1.2.0.6 | ###### | ###### | VCR Software Maintenance - OP | |||||
| 1.2.0.7 | ###### | ###### | Component tests, technology tracking - OP | |||||
| 1.3 | ###### | ###### | Distributed Systems for Production Processing R and D | |||||
| 1.3.1 | ###### | ###### | Ongoing evaluations of current practice. | |||||
| 1.3.1.1 | ###### | ###### | Evaluating current practice | |||||
| 1.3.1.2 | ###### | ###### | Ongoing Eval and Analysis of External Software | |||||
| 1.3.1.3 | ###### | ###### | Domain analysis | |||||
| 1.3.1.4 | ###### | ###### | Tutorial for CMS Physicists | |||||
| 1.3.2 | ###### | ###### | Ongoing Evaluations and Analysis of External Software | |||||
| 1.3.2.1 | ###### | ###### | Evaluating External Software | |||||
| 1.3.2.2 | ###### | ###### | Testbed Deployments of Tools and Systems | |||||
| 1.3.2.3 | ###### | ###### | LHC Computing Grid | |||||
| 1.3.2.4 | ###### | ###### | CHIMERA | |||||
| 1.3.3 | ###### | ###### | Distributed Processing Environment Prototyping | |||||
| 1.3.3.1 | ###### | ###### | Overall System Architecture | |||||
| 1.3.3.2 | ###### | ###### | Distributed Process Management / Batch Job Scheduling | |||||
| 1.3.3.3 | ###### | ###### | Virtual Organization | |||||
| 1.3.3.4 | ###### | ###### | Monitoring | |||||
| 1.3.3.5 | ###### | ###### | Dataset Tracking | |||||
| 1.3.3.6 | ###### | ###### | Data Movement | |||||
| 1.3.3.7 | ###### | ###### | Resource Brokering | |||||
| 1.3.3.8 | ###### | ###### | Monte Carlo Production Processing Support Tools | |||||
| 1.3.3.9 | ###### | ###### | Distributed Analysis Support Tools | |||||
| 1.3.3.0 | ###### | ###### | Internal Data Challenges and Milestones | |||||
| 1.3.3.1 | ###### | ###### | Interface to Application Frameworks | |||||
| 1.3.3.2 | ###### | ###### | Software Quality Assurance | |||||
| 1.3.3.3 | ###### | ###### | DPE Virtual Control Room | |||||
| 1.3.3.4 | ###### | ###### | Prototype Evaluations | |||||
| 1.3.3.5 | ###### | ###### | Simulation Efforts | |||||
| 1.3.4 | ###### | ###### | Software Support and Transitioning | |||||
| 1.3.4.1 | ###### | ###### | Software Environment | |||||
| 1.3.4.2 | ###### | ###### | Release Management | |||||
| 1.3.4.3 | ###### | ###### | Release notes | |||||
| 1.3.4.4 | ###### | ###### | Deployment Support | |||||
| 1.3.5 | ###### | ###### | External Milestones | |||||
| 1.3.5.1 | ###### | ###### | Servicing External Milestones | |||||
| 1.3.5.2 | ###### | ###### | Identification of External Milestones | |||||
| 1.3.5.3 | ###### | ###### | Special Work Needed to Meet External Milestones | |||||
| 1.3.5.4 | ###### | ###### | Milestone Post-mortems | |||||
| 1.3.6 | ###### | ###### | Tier-0/Tier-1/Tier-2 Integration | |||||
| 1.3.6.1 | ###### | ###### | Tier-0/Tier-1/Tier-2 Integration - OP | |||||
| 1.3.6.2 | ###### | ###### | Tier-0/Tier-1 | |||||
| 1.3.6.3 | ###### | ###### | Tier-1/Tier-2 | |||||
| 1.3.6.4 | ###### | ###### | Testbeds | |||||
| 1.4 | ###### | ###### | US-CMS Grid Testbed | |||||
| 1.4.1 | ###### | ###### | Infrastructure | |||||
| 1.4.1.1 | ###### | ###### | Virtual Organisation System | |||||
| 1.4.1.2 | ###### | ###### | Fabric Management System | |||||
| 1.4.1.3 | ###### | ###### | Software Packaging and Distribution System | |||||
| 1.4.1.4 | ###### | ###### | Monitoring Framework | |||||
| 1.4.1.5 | ###### | ###### | Local Job schedulers | |||||
| 1.4.1.6 | ###### | ###### | System Administration Strategy | |||||
| 1.4.1.7 | ###### | ###### | Hardware Requirements | |||||
| 1.4.2 | ###### | ###### | Middleware Services | |||||
| 1.4.2.1 | ###### | ###### | Data Movement Mechanisms | |||||
| 1.4.2.2 | ###### | ###### | Replica Catalog Systems | |||||
| 1.4.2.3 | ###### | ###### | Metadata Catalog System | |||||
| 1.4.2.4 | ###### | ###### | Virtual Data System | |||||
| 1.4.2.5 | ###### | ###### | Job Execution and Scheduler Systems | |||||
| 1.4.2.6 | ###### | ###### | Core Grid Services and Clients | |||||
| 1.4.3 | ###### | ###### | CMS Research and Development | |||||
| 1.4.3.1 | ###### | ###### | Distributed Production System (DISPRO) | |||||
| 1.4.3.2 | ###### | ###### | Distributed Analysis System (CAIGEE) | |||||
| 1.4.3.3 | ###### | ###### | PPDG activities | |||||
| 1.4.3.4 | ###### | ###### | GriPhyN activities | |||||
| 1.4.3.5 | ###### | ###### | iVDGL activities | |||||
| 1.4.4 | ###### | ###### | Documentation | |||||
| 1.4.4.1 | ###### | ###### | Deployment Manual | |||||
| 1.4.4.2 | ###### | ###### | Shift Operations Manual | |||||
| 1.4.5 | ###### | ###### | Operations | |||||
| 1.4.5.1 | ###### | ###### | VO Maintainace | |||||
| 1.4.5.2 | ###### | ###### | Fabric Maintaince | |||||
| 1.4.5.3 | ###### | ###### | Software Distribution Maintaince | |||||
| 1.4.5.4 | ###### | ###### | Tiger Team Shifts | |||||
| 1.4.5.5 | ###### | ###### | Documentation Maintaince | |||||
| 1.4.6 | ###### | ###### | Integration Grid Testbed | |||||
| 1.4.6.1 | ###### | ###### | Identify manpower for the IGT | |||||
| 1.4.6.2 | ###### | ###### | Identify hardware for the IGT | |||||
| 1.4.6.3 | ###### | ###### | SC2002 Demo Milestone | |||||
| 1.4.6.4 | ###### | ###### | Continuous Production | |||||
| 1.4.6.5 | ###### | ###### | Production Grid Milestone | |||||
| 1.4.6.6 | ###### | ###### | IGT Operations | |||||
| 1.4.6.7 | ###### | ###### | IGT Debugging | |||||
| 1.4.6.8 | ###### | ###### | IGT Documentation | |||||
| 1.5 | ###### | ###### | UF at Fermilab & USCMS Institutions | |||||
| 1.5.1 | ###### | ###### | UF Engineering Effort at Fermilab | |||||
| 1.5.1.1 | ###### | ###### | UF CD-CMS Department Effort - OP | |||||
| 1.5.1.2 | ###### | ###### | UF CD-Other Departmental Effort - OP | |||||
| 1.5.2 | ###### | ###### | UF Engineering Effort at Universities | |||||
| 1.5.2.1 | ###### | ###### | UF Engineering Effort at UW Madison - OP | |||||
| 2 | ###### | ###### | Core Application Software (CAS) | |||||
| 2.1 | ###### | ###### | Architecture Frameworks Toolkits and Reconstruction Software | |||||
| 2.1.1 | ###### | ###### | Database and Data Model | |||||
| 2.1.1.1 | ###### | ###### | Database and Data Model - OP | |||||
| 2.1.1.2 | ###### | ###### | Database Development | |||||
| 2.1.1.3 | ###### | ###### | Database Deployment | |||||
| 2.1.2 | ###### | ###### | COBRA Development | |||||
| 2.1.2.1 | ###### | ###### | COBRA Development - OP | |||||
| 2.1.2.2 | ###### | ###### | Development of First COBRA ROOT Prototype | |||||
| 2.1.2.3 | ###### | ###### | Completion of First COBRA ROOT Prototype | |||||
| 2.1.2.4 | ###### | ###### | Development of Second COBRA ROOT Prototype | |||||
| 2.1.2.5 | ###### | ###### | Completion of Second COBRA ROOT Prototype | |||||
| 2.1.2.6 | ###### | ###### | Development of Fully Functional Rootified COBRA Prototype | |||||
| 2.1.2.7 | ###### | ###### | Release of Fully Functional Rootified COBRA Prototype | |||||
| 2.1.2.8 | ###### | ###### | Rootified COBRA Development for Validation | |||||
| 2.1.2.9 | ###### | ###### | Release of Rootified COBRA Development for Validation | |||||
| 2.1.2.0 | ###### | ###### | Completion and Validation of Cobra ROOT Prototype | |||||
| 2.1.2.1 | ###### | ###### | Close-out of Prototype Phase | |||||
| 2.1.2.2 | ###### | ###### | Development of COBRA Architecture for use with POOL | |||||
| 2.1.2.3 | ###### | ###### | Release of COBRA Architecture for use with POOL | |||||
| 2.1.2.4 | ###### | ###### | Development and Preparation of COBRA Architecture for Pre-Challenge 04 | |||||
| 2.1.2.5 | ###### | ###### | Release of COBRA Architecture for Pre-Challenge 04 | |||||
| 2.1.2.6 | ###### | ###### | Continued COBRA Development | |||||
| 2.1.3 | ###### | ###### | CMS Subsystem Development | |||||
| 2.1.3.1 | ###### | ###### | CMS Sub-system Development - OP | |||||
| 2.1.3.2 | ###### | ###### | Calorimetry Reconstruction Framework Coordination | |||||
| 2.1.3.3 | ###### | ###### | PRS Reconstruction, Calibration, and Testbeam Implementation | |||||
| 2.1.3.4 | ###### | ###### | Detector Description Database | |||||
| 2.2 | ###### | ###### | Visualization and Analysis | |||||
| 2.2.1 | ###### | ###### | Graphical User Interfaces | |||||
| 2.2.1.1 | ###### | ###### | Graphical User Interfaces - OP | |||||
| 2.2.1.2 | ###### | ###### | Graphical User Interface Maintenance and Operations FFP | |||||
| 2.2.1.3 | ###### | ###### | Support and Maintenance | |||||
| 2.2.2 | ###### | ###### | Detector and Event Visualization | |||||
| 2.2.2.1 | ###### | ###### | Detector and Event Visualization - OP | |||||
| 2.2.2.2 | ###### | ###### | Assessment of PRS Requirements | |||||
| 2.2.2.3 | ###### | ###### | ORCA Visualization Development and Maintenance | |||||
| 2.2.2.4 | ###### | ###### | OSCAR Visualization Development and Maintenance | |||||
| 2.2.2.5 | ###### | ###### | Support for Dedicated Sub-detector Visualization Packages | |||||
| 2.2.3 | ###### | ###### | Analysis Software Implementation, Integration, Development, and Comissioning | |||||
| 2.2.3.1 | ###### | ###### | Analysis SW Integration, Implmntation, Dvlpment-OP | |||||
| 2.2.3.2 | ###### | ###### | Data Browsers | |||||
| 2.2.3.3 | ###### | ###### | Meta Data Browsers | |||||
| 2.2.3.4 | ###### | ###### | Interface to Local Analysis Packages | |||||
| 2.2.3.5 | ###### | ###### | Interface to Distributed Analysis | |||||
| 2.3 | ###### | ###### | Distributed Computing Software | |||||
| 2.3.1 | ###### | ###### | Grid Interfaces | |||||
| 2.3.1.1 | ###### | ###### | Gid Interfaces - OP | |||||
| 2.3.1.2 | ###### | ###### | Establishing Mutual Requirements | |||||
| 2.3.1.3 | ###### | ###### | Grid Interface Planning | |||||
| 2.3.1.4 | ###### | ###### | Development of CMS Software Grid Interfaces and Grid | |||||
| 2.3.2 | ###### | ###### | Production Tools | |||||
| 2.3.2.1 | ###### | ###### | Production Tools - OP | |||||
| 2.3.2.2 | ###### | ###### | IMPALA | |||||
| 2.3.2.3 | ###### | ###### | MC_RunJob | |||||
| 2.3.3 | ###### | ###### | Production and Data Challenges | |||||
| 2.3.3.1 | ###### | ###### | Tool Preparation for Spring 2002 Production | |||||
| 2.3.3.2 | ###### | ###### | Start of Spring 2002 Production | |||||
| 2.3.3.3 | ###### | ###### | Spring 2002 Production | |||||
| 2.3.3.4 | ###### | ###### | Completion of CMS Spring 2002 Simulated Event Production | |||||
| 2.3.3.5 | ###### | ###### | Release of Spring Production Note | |||||
| 2.3.3.6 | ###### | ###### | Post DAQ TDR Production | |||||
| 2.3.3.7 | ###### | ###### | Completion of Post DAQ TDR Production | |||||
| 2.3.3.8 | ###### | ###### | Evaluation of Production and Grid Tools | |||||
| 2.3.3.9 | ###### | ###### | Initial non-grid Production Tool Choices | |||||
| 2.3.3.0 | ###### | ###### | Preparations for Pre-Challenge Production | |||||
| 2.3.3.1 | ###### | ###### | Production tools tutorial | |||||
| 2.3.3.2 | ###### | ###### | Start of Pre-Challenge 04 | |||||
| 2.3.3.3 | ###### | ###### | Completion of Pre-Challenge 04 | |||||
| 2.3.3.4 | ###### | ###### | Final Transfers to CERN for DC04 | |||||
| 2.3.3.5 | ###### | ###### | Data Challenge 04 | |||||
| 2.3.3.6 | ###### | ###### | Completion of Data Challenge 04 | |||||
| 2.4 | ###### | ###### | Support | |||||
| 2.4.1 | ###### | ###### | Production and Data Challenge Support | |||||
| 2.4.1.1 | ###### | ###### | Production and Data Challenge Support - OP | |||||
| 2.4.2 | ###### | ###### | Software Support Tools | |||||
| 2.4.2.1 | ###### | ###### | Software Support Tools - OP | |||||
| 2.4.2.2 | ###### | ###### | DAR | |||||
| 2.4.2.3 | ###### | ###### | SCRAM | |||||
| 2.4.3 | ###### | ###### | Software Quality and Assessment | |||||
| 2.4.3.1 | ###### | ###### | Software Quality and Assessment | |||||
| 2.4.3.2 | ###### | ###### | SCRAM Support | |||||
| 2.4.4 | ###### | ###### | User and Developer Support | |||||
| 2.4.4.1 | ###### | ###### | User and Developer Support - OP | |||||
| 2.5 | ###### | ###### | CAS Engineering at Fermilab & Universities | |||||
| 2.5.1 | ###### | ###### | CAS Engineering at Fermilab | |||||
| 2.5.1.1 | ###### | ###### | CAS CD-CMS Department Effort - OP | |||||
| 2.5.1.2 | ###### | ###### | CAS CD-Other Departmental Effort - OP | |||||
| 2.5.2 | ###### | ###### | CAS Engineering Effort at Universities | |||||
| 2.5.2.1 | ###### | ###### | CAS Engineers at Caltech - OP | |||||
| 2.5.2.2 | ###### | ###### | CAS Engineers at Princeton - OP | |||||
| 2.5.2.3 | ###### | ###### | CAS Engineers at UCD - OP | |||||
| 3 | ###### | ###### | SCPO | |||||
| 3.1 | ###### | ###### | Project Office | |||||
| 3.1.1 | ###### | ###### | Project office engineering | |||||
| 3.1.1.1 | ###### | ###### | Project office engineering - OP | |||||
| 3.1.2 | ###### | ###### | Manage Project Tasks | |||||
| 3.1.3 | ###### | ###### | Manage resources | |||||
| 3.1.4 | ###### | ###### | System engineering | |||||
| 3.1.5 | ###### | ###### | Review preparation | |||||
| 3.1.6 | ###### | ###### | Education and outreach | |||||
| 3.2 | ###### | ###### | Management reserve | |||||
| 3.2.1 | ###### | ###### | Management Reserve Fermilab - OP | |||||
| 3.2.2 | ###### | ###### | Management Reserve Fermilab - EQ | |||||
| 3.2.3 | ###### | ###### | Programmatic Travel | |||||
| 3.2.3.1 | ###### | ###### | Programmatic Travel Fermilab | |||||
| 3.3 | ###### | ###### | Programmatic M&S | |||||
| 3.3.1 | ###### | ###### | Programmatic M&S Fermilab | |||||
| 3.3.1.1 | ###### | ###### | Programmatic M&S Fermilab - OP | |||||